Same as shown in the pic and quality too
Really Superb
Use one of the coupon codes below at checkout to unlock extra savings!
COD Available
Use code JFCC10 for extra 10% off
Free shipping on all orders
Couldn't load pickup availability
Transform your winter bedding with the Serene Sage Green Soft Velvet Finish Double Bedsheet, a perfect blend of functionality and luxury. Crafted with premium woolen fabric, this bedsheet provides superior warmth and a soft velvet finish for unmatched comfort. Its elegant sage green hue adds a touch of sophistication, making it an excellent addition to your bedroom décor. 🌟
Bedsheet Size: 100" x 100" inches (±5%) (254 cm x 254 cm), ideal for double or king-size beds.
Fabric: Made from premium wool with a 150 GSM fabric weight, ensuring durability and exceptional warmth.
Thread Count: 300 TC for a smooth and soft texture that enhances your sleeping experience.
Pillow Cover Size: Includes 2 matching pillow covers measuring 18" x 28" inches (±5%) (46 cm x 71 cm) for a complete bedding set.
Warmth & Comfort: Naturally insulating wool keeps you cozy on chilly nights while maintaining breathability for added comfort.
Dry clean recommended to maintain the quality, softness, and durability of the wool fabric. 🧼
Whether you’re upgrading your winter bedding or looking for a luxurious gift, the Serene Sage Green Soft Velvet Finish Double Bedsheet with Matching Pillow Covers is the perfect choice for creating a warm, inviting, and elegant bedroom.
🛒 Order yours today and indulge in the perfect combination of warmth, comfort, and luxury! ❄️✨
#WoolenBedsheet #LuxuryBedding #WinterEssentials #CozyComfort #VelvetFinish
Manufactured/Packaged/Imported/Marketed by :
Surmanja Infotech Private Limited, M 67 Mahesh Colony, Tonk Phatak, Jaipur, Rajasthan 302015
For more details please connect With us at info@JaipurFabric.com or call us +91-93140-75567